200 sites labeled Towards Zero Waste to Landfill
Terms of the action or commitment
x
Levers mobilized for circular economy (according to Ademe)
Implementation timeline
Starting year
2015
Ending year
2013
Main actors mobilized
Internal actors
X
External actors
X
Geographic area
X
2022 follow-up of the action
Date of follow-up
24th January 2021
Methods of validation of the follow-up
A site achieves Towards Zero Waste to Landfill, if it recovers, by weight of its annual waste production, more than 99% of its metal waste and more than 97% of its non-metallic waste, as well as 100% proper handling and treatment of hazardous waste. Proper handling and treatment of hazardous waste means that hazardous waste shall be handled as per Schneider Electric’s requirements and local regulations, whichever is the most restrictive. Peformance is report and track using Schneider Electric own tool.
Status of the action
In progress
Completed
a) Results
Achieved
Partially achieved
Not achieved
Cancelled
Comparison with the projected pace in the last publications
Keeping up with the times
In advance
Delayed
Partial / Final results
206 sites/200
Company's comments
Zero Waste to Landfill program has evolved in 2021 into the “Waste to Resources” program.